ASTM e-1105 Field Window / Curtainwall Testing A Success in Baltimore

Calibrated spray rack positioned in place via high reach lift.


Water being applied at prescribed rate via calibrated nozzles.






Recon Independent Assessments returned to the Sinai Hospital Tower Expansion Project for another round of field testing. Three elevations on two floors had specimens tested using the ASTM e-1105. All assemblies and openings passed the tests successfully with no water intrusion being observed.

Testing was conducted over two days and as always, our experience with the staff on site was top notch.