Recon Independent Assessments Provided Field Testing As Required By Project Specifications at a Central Florida Elementary School Construction Project.
Field Testing of installed windows using the ASTM e-1105 test procedure was undertaken to ensure the design goals of the project were met.
The School Board requires Independent Third Party Field Testing to ensure work is done correctly.